Road surface pulverizing work is beginning today(Wednesday August 13th) in Mississippi Mills.
The following roads will be affected: Argyle Street (between Country Street and St. George Street); Pick Road (between Ramsay Concession 8 and County Road 29) and Ramsay Concession 8 (from County Road 29 to the municipal limit).
The existing roads will be pulverized and graded with new granular material applied. Asphalt paving will then occur later this fall.
For more information, check: https://www.mississippimills.ca/…/notice-of-road-work…/
By Rick Stow